MANUFACTURING

Zarin Textiles

Production and finance operations streamlined end-to-end.

Client
Zarin Textiles
Industry
Manufacturing
Duration
8 months
28% Cost Reduction
40% Productivity Gain
50% Faster Closing
01

Overview

Reduced closing cycles and improved production throughput.

02

Challenge

Manual production tracking caused delays and cost overruns.

03

Solution

Built custom MRP module with automated inventory and finance sync.

04

Results

Reduced closing cycles and improved production throughput.

LET'S DISCUSS YOUR PROJECT

What would you like your software to do better?

Tell us about the tool you want to build, the systems you need to connect, or the process that takes too much manual work.

LET'S DISCUSS YOUR PROJECT

What would you like your software to do better?

Tell us about the tool you want to build, the systems you need to connect, or the process that takes too much manual work.